Skip to main content

Camber Close

Download Our Brochure

Camber Close

ALU Installations has undertaken a significant cladding remediation project in the heart of Brighton, focusing on four separate blocks, covering a total area of over 750 square meters. The primary objective of this project is to replace old non-complaint, tired, combustible timber ship lap cladding with a modern, fully compliant non-combustible rain screen system.

The projects aim was to enhance the safety of the buildings by replacing the combustible timber cladding with a non-combustible alternative, thereby reducing fire risks. Ensuring compliance with current building regulations and fire safety standards is a critical aspect of this endeavour. Additionally, the project seeks to upgrade the visual appeal of the buildings, whilst not changing the colour or appearance of the existing buildings but giving them a fresh, contemporary look, and to provide a long-lasting solution that will protect the buildings from weather and environmental damage.

The existing timber ship lap cladding was safely removed and properly disposed of in accordance with environmental regulations. The installation phase involves fitting the non-combustible rain screen system, implementing fire-stopping measures, and ensuring all components meet compliance standards. Throughout this process, quality control checks are conducted to ensure adherence to safety and compliance protocols.

The final phase involved a comprehensive inspection of the installed cladding system, followed by certification to confirm that the new cladding meets all relevant safety and compliance standards. Handover documentation and guidance on maintenance and care of the new system are also provided.

This project brings numerous benefits, including enhanced safety through the significant reduction of fire risk, compliance with current fire safety and building regulations, and improved aesthetics that enhance the visual appeal and potentially increase property value. The new cladding system also offers increased durability, providing better protection against the elements and ensuring a longer lifespan.

In conclusion, ALU Installations’ cladding remediation project in Brighton represents a critical investment in safety, compliance, and aesthetic enhancement. By replacing the outdated and hazardous timber cladding with a state-of-the-art non-combustible rain screen system, the project not only brings the buildings up to current safety standards but also improves their overall appearance and durability, ensuring they remain safe and attractive for years to come.

Our Services

Decking

Cladding

Handrails

Balustrades

Soffits

Pre-Fabricated Balconies

Testimonials

George and his team are a great asset for us. They have worked some prestigious and high-profile balcony remediation projects across the UK using AliDeck materials, several of which have been featured in earlier issues of Housing Association Magazine. We're always pleased with the outcomes they achieve with our products.

RichardDirector - AliDeck

I have no hesitation in highly recommending ALU Installations. They provided us with a real proactive and responsible team of operatives. Who, not only helped us out on our project but went over and above their work brief. Our program had fallen behind schedule due to previous poor contractor installations, ALU managed to complete more work in less time whilst providing installation of the highest standards I have seen. ALU's project supervisor Kevin, won our monthly site safety league award during their works with us. ALU Installations are a top quality company who provide outstanding service.

Jeff CunnewSite Manager - Kier Construction

Alu-Installations and Ali-Deck carried out a full Design, Supply and Installation service which included Balcony Screens, Terraces, Roof-Tops and Internal walkways. T The work was carried out over 3 occupied blocks. All existing timber needed to be stripped and replaced. The work was carried out safely and efficiently. The workmanship was excellent. The overall finish was a job to be proud off. Highly recommended.

Huseyin KaynakciManaging Quantity Surveyor at Breyer

Having used ALU Installations on several projects, I have always been impressed with their professionalism. They are a contractor who always delivers to the highest standards. They are reliable, efficient, and responsive. I would highly recommend ALU Installations to anyone looking for a contractor to carry out remedial or new build.

Sam BartlettDirector - Willbar Construction

Quality, Training & Health And Safety

Throughout every aspect of our business, we are committed to maintaining high health and safety standards. Our in-house Health and Safety team oversees all aspects of our operations, including risk assessments, method statements, and mental health first aid. The safety and health of our employees and clients are a top priority and a core value of our organisation. Over the past 5 years, ALU’s accident frequency rate ‘AFR’ has been 0.00. Our record speaks for itself.

Companies we work with:

Thats enough of us, now lets talk about your project

Let's talk & chat!