Skip to main content

East Quay House

East Quay House

This project involves the removal of combustible decking and substructure, the installation of an efius fireproof membrane, the installation of a non-combustible Alideck aluminium substructure and cement fiber board, and the installation of an Alideck soffit that will be functioning as a drainage system to effectively discharge water from the balconies.

The removal of combustible materials is essential to ensure the safety of the building and protect it from potential fire hazards. By replacing the existing decking and substructure with the non-combustible Alideck aluminium substructure and cement fiber board, we can enhance the fire resistance of the structure.

The efius fireproof membrane plays a vital role in inhibiting the spread of fire. By sealing the space between the new substructure and the existing building, it provides an additional layer of protection against fire. The membrane’s fire-resistant properties help prevent flames from penetrating the building and endangering the occupants.

To further enhance the fire resistance of the building, a non-combustible Alideck aluminium substructure and cement fiber board will be installed. These materials are specifically designed to resist fire and meet the strict fire safety standards required in buildings of this nature. By incorporating these materials, we aim to create an environment that is as safe as possible.

In addition to fire resistance, the project also involves the installation of an Alideck soffit. This soffit will not only act as a decorative element but also serve as a drainage system for the balconies. By channeling water away from the building’s exterior, the soffit will help prevent the build-up of moisture, reducing the risk of water damage and structural issues.

Overall, the East Quay House project involves a comprehensive approach to enhance the fire safety of the building. Through the removal of combustible materials, the installation of an efius fireproof membrane, the utilization of a non-combustible Alideck aluminium substructure and cement fiber board, and the implementation of an Alideck soffit as a drainage system, we are taking significant steps towards creating a safer environment for the occupants.

Our Services

Decking

Cladding

Handrails

Balustrades

Soffits

Pre-Fabricated Balconies

Testimonials

George and his team are a great asset for us. They have worked some prestigious and high-profile balcony remediation projects across the UK using AliDeck materials, several of which have been featured in earlier issues of Housing Association Magazine. We're always pleased with the outcomes they achieve with our products.

RichardDirector - AliDeck

I have no hesitation in highly recommending ALU Installations. They provided us with a real proactive and responsible team of operatives. Who, not only helped us out on our project but went over and above their work brief. Our program had fallen behind schedule due to previous poor contractor installations, ALU managed to complete more work in less time whilst providing installation of the highest standards I have seen. ALU's project supervisor Kevin, won our monthly site safety league award during their works with us. ALU Installations are a top quality company who provide outstanding service.

Jeff CunnewSite Manager - Kier Construction

Alu-Installations and Ali-Deck carried out a full Design, Supply and Installation service which included Balcony Screens, Terraces, Roof-Tops and Internal walkways. T The work was carried out over 3 occupied blocks. All existing timber needed to be stripped and replaced. The work was carried out safely and efficiently. The workmanship was excellent. The overall finish was a job to be proud off. Highly recommended.

Huseyin KaynakciManaging Quantity Surveyor at Breyer

Having used ALU Installations on several projects, I have always been impressed with their professionalism. They are a contractor who always delivers to the highest standards. They are reliable, efficient, and responsive. I would highly recommend ALU Installations to anyone looking for a contractor to carry out remedial or new build.

Sam BartlettDirector - Willbar Construction

Quality, Training & Health And Safety

Throughout every aspect of our business, we are committed to maintaining high health and safety standards. Our in-house Health and Safety team oversees all aspects of our operations, including risk assessments, method statements, and mental health first aid. The safety and health of our employees and clients are a top priority and a core value of our organisation. Over the past 5 years, ALU’s accident frequency rate ‘AFR’ has been 0.00. Our record speaks for itself.

Companies we work with:

Thats enough of us, now lets talk about your project

Download Our Brochure

"*" indicates required fields

Let's talk & chat!