Located in Blackwall, London,
The Lighthouse project overlooks Canary Wharf, the Thames, and the O2 arena.
The project consisted of replacing non-compliant materials, including tired timber decking and timber cladding. A mineral composite board was used in place of the previous decking, as well as an aluminium substructure. The cladding was replaced with a non-combustible insulation and cladding system. Method of access on this project was a mix of mast climbers and scaffolding.